EIBAK Group← Back to component rangeRequest this part
EIBAK / DRILLING COMPONENTSFILE 19 OF 21

Well construction

Intermediate Casing

Intermediate casing isolates difficult formations and allows drilling to continue safely below the surface string.

Request this component
Technical cutaway illustration of intermediate well casing
COMPONENT VISUAL · NOT TO SCALE
SUPPLY PROFILE
Inquiry code
EIBAK–DRL–19
Rig system
Well construction
Supply basis
Matched to requirement

01 / FUNCTION

What it does

A well may use one or more intermediate strings to manage pressure changes, unstable rock or lost-circulation zones. The well design sets the diameter, grade, connection and setting depth.

02 / RFQ INPUTS

What to specify

  • Outside diameter and weight
  • Steel grade
  • Connection type
  • Setting depth and quantity

03 / SUPPLY CONSIDERATIONS

What helps us source it

Intermediate strings isolate troublesome formations and pressure regimes; the well program defines collapse, burst and tensile needs.

  • Outside diameter and wall or weight
  • Grade and connection
  • Setting depth
  • Service environment and quantity

04 / COMMERCIAL SUPPORT

From requirement to offer

EIBAK coordinates the inquiry around the specification you provide. We review suitable manufacturer options, availability, technical documents, inspection requirements and delivery terms before preparing the commercial offer.

Request a quotation

RELATED · Well construction

16Surface Casing17Cement20Production Casing